Predictive Control
The finite test of an effective In-Plant Logistics Services is availability at point of fit. This level of assurance is something that can only be achieved through proactive planning.
Confidence is based on the implementation of Predictive Control elements, each designed to identify issues in advance, qualify and quantify what is possible and provide rapid feedback - all under control and in good time.
Simulation is at the base of this process, but practical measures are also vital. Predictive Controls include stock checking on receipt to catch incoming stock discrepancies, scan to load processes to manage complexity, ‘first off’ build verification, and a series of embedded audit processes across route management and real time job observation.
In the real world, plans change. Demand fluctuates and the unexpected happens. Control and stability of flow to the line must remain uncompromised by these factors.
Within our Predictive Control Processes, we pre-set triggers to activate contingent controls. These contingent controls enable us to react in a uniform and measured way and never lose focus - even under pressure. This level of real time response is the product of meticulous planning and rigorous attention to detail.